NPDES & Stormwater Consulting
Practical planning, inspection and erosion-control support for construction projects—from coordination with your civil engineer through BMP inspection, correction and reporting.
How we can help
- Design coordination with civil engineers
- NPDES planning and filing support
- BMP installation, inspection and correction
- Event monitoring and reporting
- Stream and sediment-impact monitoring
- Erosion and sediment-control consulting
What to expect
- Project-specific scope and deliverables
- Coordination across planning and field work
- Documentation to support compliance management
Start with your project
Share site location, phase and permit status
Define planning, inspection or correction needs
Agree deliverables, schedule and fee
Before we begin
Scope and required monitoring depend on the site, project phase and applicable permit. Design work is coordinated with the project’s civil engineer; deliverables and responsible professionals are defined in the engagement.
Questions about this service
Which project stages can you support?
Support can be scoped for planning and filing, work before land disturbance, active construction, BMP correction and closeout. Tell us your project phase and any immediate deadlines.
Can you work with our civil engineer?
Yes. Design coordination is part of the service. The engagement defines the civil engineer’s role, consulting responsibilities, deliverables and site-specific needs.
What information is needed for a scope review?
Provide the site location, including state, disturbed acreage, project phase, permit or plan status, existing civil engineer and the inspections, corrections or reporting you need.
How are inspection and monitoring fees set?
Fees are based on the site, required services, schedule, travel and reporting scope. We review those requirements before proposing a fee.
Stormwater service areas & credentials
CPESC / NPDES and stormwater consulting is available for projects in Georgia, North Carolina, Florida, Colorado, Tennessee, South Carolina, Texas, Arizona, Utah, New Mexico and Wyoming.
Credentials include CPESC, Georgia NPDES Level 1B Inspector and Georgia NPDES Level II Design. The engagement defines services, responsible professionals and any state- or permit-specific requirements for your project.
Request a Stormwater Scope Review
Tell us where your project stands and the support you need. We’ll review fit and define the next step.
Prefer to talk?
(678) 459-5579
_1764375003159-AlfSB_5j.png)